Customizable Small Box Girder Formwork for Infrastructure Projects
Product Details
| After-sales Service: | Online Technical Support |
|---|---|
| Warranty: | 1 Year |
| Certification: | ISO, ISO 9001/ISO 14001/ISO 45001 |
Manufacturer/Factory & Trading Company
360° Virtual Tour
Diamond Member Since 2024
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Customization from Designs
R&D Capabilities
Self-branded
Standardized quality control
The supplier provides design based customization services
The supplier has 77 R&D engineers, you can check the Audit Report for more information
The supplier has 1 Self-brands, check the Audit Report for more information
The supplier has a complete and standardized quality control process, check the Audit Report for more information
Sign In to see all verified strength labels (18)
Find Similar Products
Basic Info.
- Model NO.
- Small Box Girder Formwork
- Material
- Steel
- Type
- Precast Box Girder Formwork
- Surface Treatment
- Blast Spray Paint
- Size
- Customized
- Application
- Bridge or Highway
- MOQ
- 20 Tons
- Project Solution Capability
- Graphic Design, 3D Model Design, Other
- Sales Unit
- Ton
- Colour
- Red/Blue/Customized
- Design Style
- Contemporary
- Delivery Time
- Days
- Package
- Standard Package
- Packing Type
- Standard Package
- Transport Package
- Standard Package
- Specification
- Customized
- Trademark
- WuXin
- Origin
- China
- HS Code
- 8474802000
Product Description
Bridge Small Box Girder Steel Mold Formwork
ADVANCED TECHNOLOGIES
• Immerse yourself in the cutting-edge flexibility with our rapid formwork system, designed for effortless removal and replacement, catering to diverse beam lengths with unmatched speed and precision.
• Unleash seamless innovation with our swift disassembly and reassembly of the bottom formwork's movable blocks, redefining efficiency and ease of use.
• Experience unparalleled operational efficiency with our internal formwork's self-propelled running feature, setting new standards in seamless construction processes.
• Accelerate your construction projects with our prefabricated box girder formwork, complemented by a comprehensive tooling system designed to maximize productivity and precision.
• Unleash seamless innovation with our swift disassembly and reassembly of the bottom formwork's movable blocks, redefining efficiency and ease of use.
• Experience unparalleled operational efficiency with our internal formwork's self-propelled running feature, setting new standards in seamless construction processes.
• Accelerate your construction projects with our prefabricated box girder formwork, complemented by a comprehensive tooling system designed to maximize productivity and precision.
EXTENSIVE EXPERIENCE
• Our expertly engineered formworks, crafted for a variety of bridge types including Q2325, Q2322, and Q2229, have been meticulously designed and deployed across countless prestigious projects. From high-speed railways to cross-sea bridges, our solutions represent the pinnacle of engineering prowess, seamlessly integrating into high-demand environments such as highways, intercity rail transits, and municipal works.
• Our expertly engineered formworks, crafted for a variety of bridge types including Q2325, Q2322, and Q2229, have been meticulously designed and deployed across countless prestigious projects. From high-speed railways to cross-sea bridges, our solutions represent the pinnacle of engineering prowess, seamlessly integrating into high-demand environments such as highways, intercity rail transits, and municipal works.
The one-step fully hydraulic automatic mold retraction of the internal mold:
Revel in the innovation of a fully hydraulic automatic mold retraction system that negates the need for personnel within the beam's inner cavity during retraction. This innovation not only economizes on time and labor costs but also significantly boosts safety and operational efficiency.
The main girder:
Our main beam showcases a robust design with an upper structure outfitted with rails, delivering exceptional rigidity and providing generous operational space beneath the bottom formwork, ensuring optimal convenience and efficiency for operators.
The "automatic longitudinal moving device of internal mold":
Step into the future with our automatic longitudinal moving device for the inner formwork. This groundbreaking feature banishes the outdated winch method, simplifying operations significantly while enhancing safety to unprecedented levels.


















Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.
Q: What is your terms of payment ?
A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.
Send your message to this supplier
People who viewed this also viewed
-
US$900.00-1,600.00 / Ton
-
US$900.00-3,800.00 / Ton
-
US$1,200.00-2,000.00 / Ton
-
US$1,200.00-2,000.00 / Ton
-
US$1,200.00-2,000.00 / Ton
-
US$900.00-1,600.00 / Ton
-
US$900.00-1,600.00 / Ton
-
Customized Quality-Assured Concrete Building Bridge Construction Material Mould Pier Column FormworkUS$1,000.00-1,600.00 / Ton
-
US$900.00-3,800.00 / Ton
-
US$800.00-1,500.00 / Ton
Product Groups
More
Find Similar Products By Category
- Supplier Homepage
- Products
- Box girder formwork
- Small Box girder formwork
- Customizable Small Box Girder Formwork for Infrastructure Projects
Related Categories
Hot Searches
More