•Rapid removal and replacement of the formwork with various beam lengths;
•Rapid disassembly/assembly of the movable blocks of bottom formwork;
•Self-propelled running of internal formwork;
•Prefabricated box girder formwork and complete set of tooling system.
EXTENSIVE EXPERIENCE
•Formworks for various bridge types have been designed, such as Q2325, Q2322, Q2229 and used in plenty of projects, for instance, high-speed railways, passenger dedicated lines, highways, intercity rail transits, municipal works, cross-sea bridges, etc.
The one-step fully hydraulic automatic mold retraction of the internal mold :
No need for personnel to enter the inner cavity of the beam body during the mold retraction process, which saves time and labor, and is safe and efficient.
The main girder:
The main beam uses upper structure, with rails, which has high rigidity, and provides enough space under botton formwork for the operator.
The "automatic longitudinal moving device of internal mold":
Optional for automatic longitude moving device of inner formwork, which replaces the traditional method by winch, and makes the operation easier and safer.
Applications
Detailed Photos
Company Profile
FAQ
Q: Are you trading company or manufacturer ? A: We are factory.
Q: How long is your delivery time? A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ? A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.
Q: What is your terms of payment ? A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.