Precast Viaduct Building Material Segmental Girder Beam Mold Formwork

Product Details
After-sales Service: Online Technical Support
Warranty: 1 Year
Certification: ISO 9001/ISO 14001/ISO 45001
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Customization from Designs
The supplier provides design based customization services
R&D Capabilities
The supplier has 77 R&D engineers, you can check the Audit Report for more information
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (18)
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
  • Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Find Similar Products
  • Overview
  • Product Description
  • Applications
  • Detailed Photos
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Segmental Girder Formwork
Material
Steel Q235 or Q345b
Type
Forming Traveller
Surface Treatment
Blast Spray Paint
Size
Customized
Application
Bridge or Highway
MOQ
60 Tons
Project Solution Capability
Graphic Design, 3D Model Design, Other
Sales Unit
Ton
Colour
Red/Blue/Customized
Operation
Convernient to Operate
Delivery Time
Days
Package
Standard Package
Packing Type
Standard Package
Transport Package
Standard Package
Specification
Customized
Trademark
WuXin
Origin
China
HS Code
8474802000

Product Description

Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Product Description

Bridge Segmental Girder Steel Mold Formwork
 
Design capacity

Optimize the structural design, use three-dimensional modeling, simulate the combination of each formwork after the mold state, use of working conditions, demolding state, comprehensive consideration of the layout of the construction area and supporting equipment, combined with the total construction period and the specific construction period, the rationalization of the configuration of the corresponding type and number of formworks, to ensure that the construction at the same time to reduce the investment in the project.
 
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
 
Beam Characteristics:
Single-box single-chamber, single-box multi-chamber, curved beams, twisted beams, etc.
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Complete range of products:
54 sets of section beam formworks, including standard, large-span, twisted beams of 3 major types and each type has a variety of different combinations of the use of the project.
 
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Service Force
We have our own professional installation engineer service team. 
After the formwork is delivered for use, the theoretical + practical training for on-site construction personnel, the sections need to be interchanged between the tooth block, movable block and other parts of the technology and on-site briefings.
The use of the process, the company organizes the relevant technology, sales, after-sales personnel to visit regularly.
Applications
 
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork

 

Detailed Photos
 

Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork
Precast Viaduct Building Material Segmental Girder Beam Mold Formwork

Company Profile
 

Precast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold FormworkPrecast Viaduct Building Material Segmental Girder Beam Mold Formwork
 

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.

Q: What is your terms of payment ?
A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier