Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering

Product Details
After-sales Service: Online Technical Support
Warranty: 1 Year
Certification: ISO, ISO 9001/ISO 14001/ISO 45001
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Customization from Designs
The supplier provides design based customization services
R&D Capabilities
The supplier has 77 R&D engineers, you can check the Audit Report for more information
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (18)
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
  • Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Find Similar Products
  • Overview
  • Product Description
  • Applications
  • Detailed Photos
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Steel Bridge Pier Formwork
Material
Steel
Type
Precast Box Girder Formwork
Surface Treatment
Blast Spray Paint
Size
Customized
Application
Bridge or Highway
MOQ
100 Tons
Project Solution Capability
Graphic Design, 3D Model Design, Other
Sales Unit
Ton
Colour
Red/Blue/Customized
Design Style
Contemporary
Delivery Time
Days
Package
Standard Package
Packing Type
Standard Package
Transport Package
Standard Package
Specification
Customized
Trademark
WuXin
Origin
China
HS Code
8474802000

Product Description

Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering 
Product Description

Bridge Steel Pier Cap Mold Formwork 

 
Applications: 
railroads, highways, municipal viaducts, cross-sea bridges

Project Features:

Short lead time
Controlled construction quality
Low cost
Low environmental impact
Mass production

Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Design Capacity
1. the company set up a special construction industrialization equipment research institute, for assembly bridge prefabricated components complete sets of tooling and equipment for the whole process of research and development.

2. Construction of the whole process of tooling design, from the bearing platform reserved for the main reinforcement frame to the prefabricated pier body reinforcement binding, formwork assembly and turning, prefabricated area base and formwork and a series of related design.

3. Assembly construction requires that the molding accuracy of each part of the beams on site is absolutely controlled within the limited range to ensure that the beams are accurately matched. The company introduced automatic welding robots, laser cutting machines, precision CNC machine tools and other advanced production equipment to ensure that the precision of the workpiece products strictly meet the standards.

 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Service Force
We have our own professional installation engineer service team. 
After the formwork is delivered for use, the theoretical + practical training for on-site construction personnel, the sections need to be interchanged between the tooth block, movable block and other parts of the technology and on-site briefings.
The use of the process, the company organizes the relevant technology, sales, after-sales personnel to visit regularly.
 
Applications
 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering

 

Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
 
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering

 

Detailed Photos

 

Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering

 
Company Profile
About WuXin
Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering

Hunan Wuxin Intelligence Technology Co., Ltd was established in September 2005 and is a highly professional supplier in the field of overall solutions for road and bridge construction technology. Relying on 20 years of factory operation experience, Wuxin Technology now has more than 1,400 employees.

The company centers on developing intelligent, equipment-centered, and standardized formwork, providing customers with efficient, safe, and convenient products, solutions, and services. Its business spans railways, highways, cross-sea bridges, rail transit, and municipal construction. The designed and manufactured products like information-based prefabricated production lines for bridge components, various beam and pier templates, vehicle and trestle bridges have been used in many key projects globally.


Representative projects of product application:

High-speed railway projects: Jakarta-Bandung High-Speed Railway in Indonesia, Menghua, Shanghai-Kunming, Xiong'an-Guangzhou High-Speed Railway, etc., which vividly demonstrate our active participation in international high-speed rail construction.

Highway projects: Beijing-Hong Kong-Macao, Guangzhou-Shenzhen, Hangzhou-Shaoxing-Ningbo, Shangri-La, etc., with a portion of projects also showing our influence in the international highway domain.

Urban rail transit projects: Changsha Maglev (MLF), Fenghuang Maglev (MLF), Shanghai Metro, Nanjing Metro, etc., and some of our technologies and products have also been introduced and applied in international urban rail transit systems.

Cross-sea bridge projects: Hong Kong-Zhuhai-Macao Bridge, Main Channel of Zhoushan Port, Quanzhou Bay Cross-sea Bridge, Yueqing Bay Cross-sea Bridge, etc., where our cross-sea bridge solutions have made significant contributions and have also been recognized and adopted in international bridge construction projects.

Overseas projects: Jakarta-Bandung High-Speed Railway in Indonesia, Padma Bridge in Bangladesh, Kimpi Bridge in Zambia, Mombasa-Nairobi Railway, China-Laos Kunming Railway, etc. These overseas projects distinctly highlight our extensive international business scope and strong competitiveness in the global market.
 
Certifications

 

Hydraulic Prefabricated Pier Mould Formwork Concrete Building Material Municipal Engineering
Packaging & Shipping

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.


 

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.

Q: What is your terms of payment ?
A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier