•Rapid removal and replacement of the formwork with various beam lengths;
•Rapid disassembly/assembly of the movable blocks of bottom formwork;
•Self-propelled running of internal formwork;
•Prefabricated box girder formwork and complete set of tooling system.
EXTENSIVE EXPERIENCE: Proven Excellence Across Industries
• Our meticulously engineered formworks, including distinguished models like Q2325, Q2322, and Q2229, are a testament to our engineering excellence. Successfully applied in an array of projects such as high-speed railways, highways, and cross-sea bridges, our solutions redefine engineering prowess and set new industry benchmarks.
The one-step fully hydraulic automatic mold retraction of the internal mold : No need for personnel to enter the inner cavity of the beam body during the mold retraction process, which saves time and labor, and is safe and efficient.
The main girder: The main beam uses upper structure, with rails, which has high rigidity, and provides enough space under botton formwork for the operator.
The "automatic longitudinal moving device of internal mold": Optional for automatic longitude moving device of inner formwork, which replaces the traditional method by winch, and makes the operation easier and safer.
Applications
Detailed Photos
Company Profile
FAQ
Q: Are you trading company or manufacturer ? A: We are factory.
Q: How long is your delivery time? A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ? A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.
Q: What is your terms of payment ? A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.